Progress 3-30-09




























































































In spite of the blizzard and snow, there is progress! It looks worse than before but that's because there are so many tools in the house. Cocoa is a sweet little puppy, not 2 yrs old yet, and she goes to all the job sites and loves attention.
The pictures are backwards! I'll get the hang of this soon.
Top left is the back of the house showing the MBR addition
Top right is the gutted hall bathroom
Next left is the "window door" that was added between the MBR and #2 BR
Next to that on the right is the gutted addition behind the kitchen... this was the 2nd kitchen before
Under the 2nd BR with the window door is the gutted Master Bath
Then the same shot of the addition behind the kitchen... sorry
On the left under the gutted bathroom is the gutted kitchen
Next to that on the right is the wider opening from the living room/dining area into the kitchen
Lovely Cocoa next left
to the right of Cocoa is the new front door and window
Under Cocoa is the left side of the house with some of the new siding up
Last pic is the right side of the house... all the siding was taken off today and the new siding should all be up by the end of the day... we're getting MORE SNOW!!!
You can see the big roll-off dumpster in the driveway.
That's all for now....


























You can see the glass door that is the official window in bedroom #2. That's because on the right side of the room a garage was built and the window blocked and on the back wall the master bedroom addition was built and blocked that window. This is the room that will be marketed as a study /office /nursery /baby's room and I think it will work fine.